Banner featuring the Abbey International Logo and diagram of an Entry System

Entry Systems Title

The principle job of pipe or tube mill entry systems is to prepare the strip for forming. This is done by an integrated series of equipment which takes a coil of material, uncoils and flattens it, precisely trims and smooths its edges and introduces it into the mill, ready for the forming processes. When a Shear End Welder and Accumulator are included within the entry line, they serve to keep the mill running continuously.